EAA Workshop

Before jumping in on my first kit, I wanted to practice on something a little cheaper that I wasn’t going to actually fly in!  The EAA has a series of workshops that teach building skills.  As I googled around trying to work my courage up to actually get started on this project, almost everyone said the workshops were invaluable in building confidence in getting started.  Since I had pulled maybe 6 pop-rivets in my entire life up to this point and had never used a rivet gun, it seemed prudent to take the class.

I drove down to Frederick Maryland (home of AOPA) over the MLK weekend.  The class started bright and early Saturday morning in the EAA chapter hanger.  Jack Dueck was the instructor.  I had watched many of his home builder videos from the EAA archives.  It was fun to meet him in person.  He’s a real straight shooter and a wonderful instructor.  Four or five of the chapter members also hung around the workshop and handed out some invaluable advice.

IMG_5773

We were paired up at a table and each build a practice part (A piece of angle with a couple of sheets attached with universal, flush, and pull rivets).  I was paired up with Chris, an RV-7 builder from Pennsylvania.  We then worked together to build one practice kit.

The practice kit was a lot of fun.  People took them quite seriously, carefully smoothing edges to avoid stress cracks on a part that would never fly.  Some parts of the job were easy to bang out — like dimpling the ribs.  Other parts took a bit of creative thinking to get a countersink in the right place.  This is where having the chapter members around really helped.

IMG_5774

Here I am setting up a row of rivets for a stiffener on one of the skins.  The rivet tape holds them in place so you can flip the skin over and rivet in from the back side.  This makes for very smooth rivet installs.  It is fun and easy.

The spar took a lot more work.  We had to do a bit of countersinking on it and it was a tight squeeze to get the bucking bar in between the skins to shoot some of the rivets.  We got a couple of dings when the rivet gun went off course, but everything came out in spec.

When we got done, Jack “graded” each kit.  He was mostly looking for bad or structurally unsound rivets.  We had a couple bad ones that we drilled out and reshot before going in for our grade.  We got 100% good rivets!  The best part was Jack saying that he would fly in a plane that we built.  A nice vote of confidence!

IMG_5775

A perfectly fine practice kit!

 

 

Advertisements

2 thoughts on “EAA Workshop

  1. Pingback: Empennage inventory | n414pj

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s